Friday 24 February 2017

Post tiling site visit today

Today we had our post tiling site visit to check the tiles were installed correctly and just to have another look over everything.

We are very happy with the tiling, they look great. The Air-con has also been installed this week so that's great.

The supervisor said we are about 4 weeks from handover so will see how it goes. It is very exciting and cant wait for it to be finished and us move in.

Kitchen and splash-back (Blue subway tiles).
Kitchen looking toward walking pantry
En-suite Shower
En-suite floor and vanity location.
Main bathroom shower
Main bathroom vanity location and bath location
Main toilet
Laundry
 