Friday 10 March 2017

Post flooring site visit

We went onsite today to have another look at everything and to check out the flooring. The wife is very happy with how the floors came up, so much so she forgot to take any good photos.

Security system and A/V has been finalised, the electrician is onsite to finish the power points, light switches and lights.

The laundry tub should be in on Monday also.

The mirrors, shower screens and wardrobe fit outs should all be early next week.

We have a date of the 24th for our handover date, hopefully there will be no issues.

Vinyl floor boards in the open living areas
Main bathroom vanity
Bath hole
Main Toilet
Laundry
Ensuite shower head

Ensuite vanity.